Plano Bathroom Remodeling
Walk-in showers, double vanities, and master bath upgrades for Plano homes. Premium waterproofing, tile, and a 2-year workmanship warranty.
Bathrooms Built for the Way Plano Lives
Plano master baths tell a familiar story. Homes from the 1980s through the 2000s were built with separate tub-and-shower zones and garden tubs that rarely get used — while West Plano and Legacy homes often shipped with builder-standard finishes that leave value on the table. We remodel both, and everything in between.
Our most requested Plano project is the garden tub conversion: turning that unused tub into a spacious walk-in shower with bench seating, a linear drain, and frameless glass. We also build double vanities, heated floors, custom tile, and high-end master baths — always with proper waterproofing and ventilation for North Texas humidity.
Every project is a full-scope bathroom remodel with City of Plano permitting, itemized pricing, and our 2-year workmanship warranty.
How a Local Project Works
- Free in-home consultation — we visit your home and give honest advice on scope, timeline, and budget.
- 3D design renderings from our in-house designer, before we touch a wall.
- Itemized pricing with no surprise line items.
- 2-year workmanship warranty on every project.
Bathroom Remodel Costs in Plano, TX
Bathroom remodels in Plano typically run from $20,000 to $40,000, with high-end master baths up to $75,000.
Full bathroom remodel
$20,000 – $30,000
Timeline: 4–6 weeks
A complete guest or secondary bath: new vanity, walk-in shower or tub/shower, tile, toilet, lighting, and fixtures. A common pre-sale update across Plano.
Master bath remodel
$30,000 – $50,000
Timeline: 6–8 weeks
Garden tub conversion to a walk-in shower, double vanity, custom tile, and heated floors. Layout changes add permitting and cost.
High-end master bath
Up to $75,000
Timeline: 8+ weeks
Premium stone, curbless shower with linear drain, frameless glass, freestanding tub, and a full fixture upgrade — the top of our range.
Looking for kitchen pricing too? See our full kitchen & bathroom cost guide or our Plano kitchen remodeling page.
What's Included in Your Estimate — and What's Not
Every quote is itemized line by line, so you always know exactly what your budget covers before we start.
Included in every project
- Free in-home consultation and a detailed, itemized estimate
- In-house 3D design renderings and material selection
- Demolition and site protection
- Materials and labor for the full agreed scope
- All city permits and inspections
- Plumbing and electrical rough-in and finishing
- Project management and daily job-site oversight
- Final cleanup and a post-project walkthrough
- 2-year workmanship warranty
Not included unless specified
- Additions or new square footage
- Foundation or major structural work
- Appliances — unless included in your agreed scope
- Window or door replacement, unless specified
- Temporary housing or off-site storage during the build
- Utilities re-routed by the city or utility providers
- Any item outside the agreed scope discovered during demolition — we flag it immediately and price it transparently before proceeding
Bathroom Remodeling by Plano Neighborhood
Plano’s housing eras bring different bathroom layouts and challenges. We tailor every remodel to your home.
East Plano (1980s–2000s)
Master baths with garden tubs and dated tile. Converting the tub to a walk-in shower is the single highest-impact update we do here.
West Plano, Legacy & Whiffletree
Larger master suites with separate tub and shower zones. We reimagine them with double vanities, premium tile, and heated floors.
Downtown & Historic District
Smaller footprints in older homes. We modernize function with space-efficient layouts and character-preserving finishes.
Willow Bend & Lakeside on Preston
Custom homes where high-end materials shine — slab stone, curbless showers, and full fixture packages.
Townhomes & Condos (Austin Ranch)
Compact bathrooms with HOA rules. We design for space efficiency and coordinate all approvals.
Russell Creek, Gleneagles & Los Rios
A mix of eras. Whether it is a guest bath refresh or a full master redo, we match the scope to the home.
The Plano Bathroom Remodeling Process
A proven design-build process, from first call to final walkthrough. See the full detail on our our process page.
Free Consultation
We visit your bathroom, assess the space, and give honest advice on scope and budget.
Design & Selections
Tile, fixtures, glass, and vanity selections with 3D guidance where helpful.
Permits & Prep
We handle City of Plano permitting and protect the rest of your home before demo.
Construction
Waterproofing, tile, plumbing, and finishes — managed to a clear schedule.
Walkthrough & Warranty
Final walkthrough and our 2-year workmanship warranty.
Frequently Asked Questions About Bathroom Remodeling in Plano
Common questions about bathroom remodeling in Plano.
How much does a bathroom remodel cost in Plano, TX?
Bathroom remodels typically range from $20,000 to $40,000, with high-end full master baths running up to $75,000. We do not take on powder-room-only or sub-$20,000 projects — our remodels are complete, full-scope jobs with new tile, fixtures, and finishes.
How long does a bathroom remodel take in Plano?
Most bathroom remodels take 4–6 weeks; full master baths with layout changes often take 6–8 weeks. Tile lead times and custom glass can extend the schedule.
Can you convert a garden tub to a walk-in shower?
Yes — that is one of our most requested Plano projects. Cost depends on whether plumbing stays in place, shower size, bench and niche details, and glass selection.
Do you handle City of Plano permits for bathroom remodels?
Yes. We prepare and coordinate permits required for the agreed scope and walk you through inspections as part of project management.
Keep reading: Kitchen & bathroom cost guides · Our process · Bathroom remodeling overview
Ready to Start Your Project?
Call us directly or schedule a free in-home consultation. We'll walk your home, listen to your goals, and give you an honest, itemized estimate.
(214) 449-5922